FEC approves ₦631.3 billion for nine road projects nationwide

The Federal Executive Council (FEC) has approved approximately ₦631.3 billion for nine road infrastructure projects across Nigeria.
Join the Premium Times WhatsApp Community For Quick Access To News and Happenings Around You.
The Minister of Works, David Umahi, disclosed this after Wednesday’s FEC meeting presided over by President Bola Ahmed Tinubu at the State House, Abuja.
Mr Umahi said the projects would strengthen transportation networks, improve connectivity, and facilitate economic activities by constructing, reconstructing, and rehabilitating critical road corridors.
He said the approvals included reconstructing the 95-kilometre Etuke–Okeni–Ankpa–Otopa Road in Kogi, with a contract sum of N167 billion.
The council also approved N209 billion for reconstructing the 81.1-kilometre Ado–Ilawe–Ilumaba–Ikole Road in Ekiti, including a bridge.
Another ₦62 billion was approved for the Tungo–Karamti Road linking Adamawa and Taraba, with five bridges incorporated into the project.
Mr Umahi said FEC also approved N20.257 billion for an 18-kilometre road connecting Asiago to the Port Harcourt–Enugu Expressway.
Stay Ahead with Premium Times
Follow us on Google News and never miss breaking stories, investigations, and in-depth reporting.
An additional N30 billion was earmarked for remedial works on deteriorated sections of the East–West Road.
The council also approved N11.33 billion for a road project the Abia Government previously undertook.
Mr Umahi said the approval followed the discontinuation of its funding arrangement under the Nigerian National Petroleum Company Ltd. tax-credit scheme.
He added that N28.218 billion was approved to rehabilitate a 17-kilometre section of the Sokoto–Illela Road, Route A1.
The minister also commended Mronubu for completing the first 118-kilometre section of the Abuja–Kaduna–Zaria Road.
He said the section was completed in 30 months, with 81 kilometres constructed using reinforced concrete pavement.
He added that work on the second section, covering 164 kilometres, was nearing completion, with only 16 kilometres remaining.
Mr Umahi further disclosed that the entire 375-kilometre Abuja–Kaduna–Zaria–Kano corridor would be equipped with solar-powered streetlights.
On the Lagos–Abidjan coastal highway, the minister said ministers from countries along the corridor would meet on Friday to discuss funding arrangements.
He said the highway comprises 79 kilometres in Nigeria, 89 kilometres in Togo, 576 kilometres in Ghana, 155 kilometres in Côte d’Ivoire and 128 kilometres in Benin Republic.
According to Mr Umahi, the proposed arrangement will involve the African Development Bank providing loans to participating countries to finance their respective sections.
He said the regional highway was intended to strengthen connectivity and facilitate trade among participating West African countries.
Share this:
Discover more from Premium Times Nigeria
Subscribe to get the latest posts sent to your email.
Type your email…
Subscribe
CBD COP17: Why African countries struggle to mobilise biodiversity funding – AfDB official
Premium Times
Agency Report
More News
Tinubu to present 2027 budget to NASS in December – Minister
Court to rule on Electoral Act provision on INEC’s power to review election results
Zulum rejects relocation of NNPC exploration equipment from Borno
Nigeria renews 2030 gas flaring pledge despite enforcement, methane monitoring gaps
Defence questions EFCC witness’ evidence on N1.5bn airport contract in ex-minister Sirika’s trial
2027: APC releases supplementary list for Tinubu’s presidential campaign council (FULL LIST)
Keywords
Related Stories
Binance sees spike in withdrawals as exchange returns online after $6.3 billion heist
Nov 1 (Reuters) - Binance customers pulled $3.64 billion, or 2.1% of its assets, as the world's biggest cryptocurrency exchange went back online on Sunday after hackers the FBI links to North Korea stole billions from the platform last week.
LOCAL ELECTIONS 2026: The top four parties’ final campaign pitches
The ANC, DA, MK party and EFF all held their final campaign rallies this weekend. Here are their final pitches to voters.
Ukraine evacuates civilians from parts of Kherson region as expiry of Oleshky ceasefire nears
Nov 1 (Reuters) - Ukraine's military said it evacuated 167 people from threatened areas of southern Kherson region on Sunday as a temporary local ceasefire neared expiry -- two days after busloads of residents were brought out of the embattled Russian-held town of Oleshky.
ARTIFICIAL INTELLIGENCE OP-ED: Forget future existential threats — AI is automating gendered violence and misogyny right now
The current alarm about the future dangers of agentic AI might distract us from the very real AI harms already happening. As we speculate about whether machines might one day become dangerous to humankind, AI is deepening misogyny, eroding safety and automating gendered abuse.
Top Stories
/file/attachments/2999/12074058_329468.jpg)
Binance sees spike in withdrawals as exchange returns online after $6.3 billion heist
/file/attachments/orphans/EFF-Rally-Naledi3_522863.jpg)
LOCAL ELECTIONS 2026: The top four parties’ final campaign pitches
/file/attachments/2999/14406159_701962.jpg)
Ukraine evacuates civilians from parts of Kherson region as expiry of Oleshky ceasefire nears
/file/attachments/orphans/P33-Janet-AI-GBV_519343.jpg)
ARTIFICIAL INTELLIGENCE OP-ED: Forget future existential threats — AI is automating gendered violence and misogyny right now
/file/dailymaverick/wp-content/uploads/2024/05/ED_507282.jpg)
LOCAL ELECTIONS 2026: What happens after the vote? Councils, coalitions and (maybe) controversies
/file/attachments/orphans/OCN-Joburg-831_282388.jpg)
OUR CITY NEWS: Eighty-three parties contest crowded Joburg local government elections
/file/attachments/2994/17RC2QO5A15EFI_195687.jpg)
Troubled port: Transnet and foreign operator face scrutiny over backlog at Durban Gateway Terminal
/file/attachments/orphans/image-27_592660.jpg)
BUSINESS REFLECTION: Crossed Wires: The internet’s technical debt is due, and we can’t pay
Latest
Binance sees spike in withdrawals as exchange returns online after $6.3 billion heist
LOCAL ELECTIONS 2026: The top four parties’ final campaign pitches
Ukraine evacuates civilians from parts of Kherson region as expiry of Oleshky ceasefire nears
ARTIFICIAL INTELLIGENCE OP-ED: Forget future existential threats — AI is automating gendered violence and misogyny right now
LOCAL ELECTIONS 2026: What happens after the vote? Councils, coalitions and (maybe) controversies
OUR CITY NEWS: Eighty-three parties contest crowded Joburg local government elections
Troubled port: Transnet and foreign operator face scrutiny over backlog at Durban Gateway Terminal
BUSINESS REFLECTION: Crossed Wires: The internet’s technical debt is due, and we can’t pay